Dorney Lake
During the 1990's Summerleaze was a lead partner in the construction of the Eton Rowing Lake at Dorney, involving the construction of the lake itself and associated buildings and infrastructure.
The creation of the international-standard lake generated over 4 million tonnes of aggregate over a 10 year period, much of which was transferred by conveyor across the Thames for processing at the Summerleaze plant at Bray. As a result, many lorry movements were removed from the narrow roads around Dorney. Meanwhile, the bridge which carried the conveyor over the river has doubled as a valuable new pedestrian and cycle link between the Berkshire and Buckinghamshire banks of the river.
The project is an excellent example of co-operation between industry, public bodies and a leading education establishment, which has achieved mutual benefits and created new leisure opportunities for the public.
For enquiries about purchasing sand and gravel from us, contact our Sales Office, by phone on 01628 630444, by fax on 01628 773160 or by email at sales@summerleaze.co.uk
